Otti woos Chinese firm for Abia seaport construction
Abia State Governor, Alex Otti, has proposed a long-term partnership with China Harbour Engineering Company Limited (CHEC) for the construction and delivery of the proposed Abia Seaport City.
Otti said he wanted the Chinese company involved from the feasibility study stage through construction to the completion of the project, rather than serving merely as a consultant.
The governor made the position known on Monday when he received a CHEC delegation led by its Managing Director, Wang Jason, who presented preliminary findings on the proposed project.
He said the state expected honest professional advice from the company, adding that the feasibility study would establish the project’s viability and technical requirements.
“I am sure that my people will be engaging with you. But I know they need some clarifications.
“So, my preference would have been a partnership that takes off from the feasibility, to the construction and ultimately delivery,” Otti said.
He assured CHEC of his administration’s commitment to transparency and mutually beneficial business dealings.
“We don’t play games, we don’t cheat people. So, if you are in partnership with us, you can be sure that you can go to bed and sleep,” he added.
Otti disclosed that other investors, including Afreximbank, had expressed interest in the project, but said further commitments would depend on the feasibility study.
He added that the state had a 25-year development plan designed to sustain major projects beyond successive administrations.
Jason described the proposed seaport as viable, saying the feasibility study would determine the most suitable port design, depth and technical specifications.
“I think it is more serious for me to express our position,” Jason said, adding that CHEC was interested in long-term cooperation with Abia rather than consultancy work alone.
The proposed Azumini–Obeaku Seaport and Inland Waterways Corridor is located in Ukwa East Local Government Area. It is expected to improve maritime access for the South-East, support Aba’s industrial activities and reduce the cost of transporting goods.
Otti approved the feasibility study in May 2026, with the findings expected to establish the project’s technical, economic and environmental requirements, including the dredging needed to make the waterway navigable.
